User Tools

Site Tools


workshop2016

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
workshop2016 [2016/07/22 15:01]
ramcdona
workshop2016 [2018/08/23 11:31] (current)
mmcdonald
Line 1: Line 1:
 ====== OpenVSP Workshop 2016 ====== ====== OpenVSP Workshop 2016 ======
  
-**Registration is still Open**+**Links to 2016 workshop presentations:** [[https://nari.arc.nasa.gov/vsp]]  
 + 
 +**Registration is closed**
  
 The 2016 OpenVSP Workshop will be held August 23-25 at NASA Ames Research Center at Moffett Field California.  The 2016 OpenVSP Workshop will be held August 23-25 at NASA Ames Research Center at Moffett Field California. 
  
-Registration is capped at 100 attendeesso register right away.+If you cannot attenddon’t worry.  The workshop will be live-streamed and recorded for later viewing.  No registration is required to view the live stream.
  
-There is no charge for the workshop, but attendees have the option to pay $60 upon arrival for lunch and refreshments.+**To attend virtually:**
  
-To register, send an email with the following information to [[ramcdona@calpoly.edu|Rob McDonald]].+From any computer with a high speed internet connection, go to the [[http://ac.arc.nasa.gov/vspworkshop Workshop Streaming Site]].  Enter as a Guest and type your name.
  
-  * Name +To test your systems beforehand, go to this link, which will run a [[http://admin.adobeconnect.com/common/help/en/support/meeting_test.htm | meeting test]].  The streaming does require Adobe Flash.
-  * Email +
-  * Company/Affiliation +
-  * $60 Food Option (Y/N) +
-  * Citizenship US Resident Status -- Foreign national (non permanent resident) registration has closed. +
- +
-If you cannot attend, don’t worry.  The workshop will be live-streamed and recorded for later viewing.  No registration is required to view the live stream.+
  
 === Travel === === Travel ===
 +
 +== Location ==
 +
 +The Workshop will be held at the    [[https://www.google.com/maps/place/NASA+Ames+Conference+Center-NACC,+Building+152/@37.4070954,-122.0580382,18z/data=!4m5!3m4!1s0x808fb76bbbff49a3:0x74daba99ecfd04a2!8m2!3d37.4075789!4d-122.0571383?hl=en | NASA Ames Conference Center]], in Building 152.  It is located at: 200 Bailey Rd, Mountain View, CA 94043.
 +
 +When you arrive at the NASA Front Gate, show ID and tell them you are going to the Conference Center.  US Persons must show a valid driver's license.  Non-US Persons must show a passport.
 +
  
 == Hotels == == Hotels ==
Line 25: Line 28:
 We don't have a block of rooms or a particular hotel to recommend.  However, there are many choices within just a couple of miles of [[ https://goo.gl/maps/wrmIs | NASA Ames]]. We don't have a block of rooms or a particular hotel to recommend.  However, there are many choices within just a couple of miles of [[ https://goo.gl/maps/wrmIs | NASA Ames]].
  
 +
 +=== Streaming & Videos ===
 +
 +The Workshop will be streamed online  http://nari.arc.nasa.gov/vsp 
  
 === Agenda === === Agenda ===
Line 34: Line 41:
 |  8/23/16 Tuesday  ||| |  8/23/16 Tuesday  |||
 | 8:30-10:00  | Developer Breakout Session  | Rob McDonald || | 8:30-10:00  | Developer Breakout Session  | Rob McDonald ||
 +
 +Possible topics include (suggestions welcome):
 +  * Overall code architecture and organization
 +  * How to build OpenVSP
 +  * Submitting changes and working with Git
 +  * Automated build and test for OpenVSP
 +  * Fixing your own bug
 +  * Building your own SWIG wrapper for Python or another language
  
 == Main Track == == Main Track ==
Line 43: Line 58:
 | 9:30-10:00  | Tour of main components  | Brandon Litherland | NASA Langley | | 9:30-10:00  | Tour of main components  | Brandon Litherland | NASA Langley |
 | 10:00-10:30  | Break  ||| | 10:00-10:30  | Break  |||
-| 10:30-11:00 USAF SBIR Report  Ben/Nick ESAero +| 10:30-11:00 Cal Poly NRA Final Review  Rob McDonald Cal Poly 
-| 11:00-11:30 Attach, symmetry, sets, subsurfaces  Rob McDonald ||+| 11:00-11:30 USAF SBIR Report  Ben Schiltgen ESAero |
 | 11:30-12:00  | XSecs in detail  | Brandon Litherland | NASA Langley | | 11:30-12:00  | XSecs in detail  | Brandon Litherland | NASA Langley |
 | 12:00-12:30  | Lunch  ||| | 12:00-12:30  | Lunch  |||
 | 12:30-1:00  | ::: ||| | 12:30-1:00  | ::: |||
-| 1:00-1:30 Conformal Components  J.R. Gloudemans || +| 1:00-1:30 NASA SBIR Report  Nick Brake ESAero 
-| 1:30-2:00 Skinning explained  | Rob McDonald || +| 1:30-2:00 Attach, symmetry, sets, subsurfaces  | Rob McDonald || 
-| 2:00-2:30 Advanced Wing Modeling  | Rob McDonald ||+| 2:00-2:30 Skinning explained  | Rob McDonald ||
 | 2:30-3:00  | Break  ||| | 2:30-3:00  | Break  |||
-| 3:00-3:30 NASA SBIR Report  Nick Brake ESAero +| 3:00-3:30 Advanced Wing Modeling  Rob McDonald || 
-| 3:30-4:00 Saved Parameter Settings  Bryan Schmidt ESAero +| 3:30-4:00 Conformal Components  J.R. Gloudemans || 
-| 4:00-4:30 Modeling Demo  Rob McDonald || +| 4:00-4:30 Saved Parameter Settings  Bryan Schmidt ESAero 
-| 4:30-5:00 :::  ::: ||+| 4:30-5:00 Modeling Demo  Rob McDonald ||
 | 5:00-5:30  | :::  | ::: || | 5:00-5:30  | :::  | ::: ||
 | 5:30-6:00  | ||| | 5:30-6:00  | |||
Line 62: Line 77:
 |  8/24/16 Wednesday  |||| |  8/24/16 Wednesday  ||||
 | 8:00-8:30  | FEM from VSP Models  | Wu Li | NASA Langley | | 8:00-8:30  | FEM from VSP Models  | Wu Li | NASA Langley |
-| 8:30-9:00 Structures work  | Trevor Laughlin || +| 8:30-9:00 Structural Modeling and OpenVSP  | Trevor Laughlin | Laughlin Research 
-| 9:00-9:30  | TOW Steered Wing Structure Design  | Mike Henson | UT Arlington |+| 9:00-9:30  | TOW Steered Wing Structure Design  | Mike Henson | UT Arlington & Lockheed Martin |
 | 9:30-10:00  | Mass Properties  | Mark McMillin | NASA Langley | | 9:30-10:00  | Mass Properties  | Mark McMillin | NASA Langley |
 | 10:00-10:30  | Break  ||| | 10:00-10:30  | Break  |||
-| 10:30-11:00 VSPAERO Theory  Dave Kinney NASA Ames +| 10:30-11:00 RapidFEM & PBWeight  Tyler Winter M4 Engineering 
-| 11:00-11:30  | VSPAERO Verification  | Dave Kinney | NASA Ames |+| 11:00-11:30  | VSPAERO Theory  | Dave Kinney | NASA Ames |
 | 11:30-12:00  | VSPAERO GUI VLM Basics  | Nick Brake | ESAero | | 11:30-12:00  | VSPAERO GUI VLM Basics  | Nick Brake | ESAero |
 | 12:00-12:30  | Lunch  ||| | 12:00-12:30  | Lunch  |||
Line 73: Line 88:
 | 1:00-1:30  | VSPAERO GUI VLM Advanced  | Nick Brake | ESAero | | 1:00-1:30  | VSPAERO GUI VLM Advanced  | Nick Brake | ESAero |
 | 1:30-2:00  | VSPAERO GUI Panel Method  | Nick Brake | ESAero | | 1:30-2:00  | VSPAERO GUI Panel Method  | Nick Brake | ESAero |
-| 2:00-2:30  | VSPAERO Next Steps  | Dave Kinney | NASA Ames |+| 2:00-2:30  | VSPAERO Verification  | Dave Kinney | NASA Ames |
 | 2:30-3:00  | Break  ||| | 2:30-3:00  | Break  |||
-| 3:00-3:30  | VSPAERO SUGAR braced wing aero  Doug Wells | NASA Langley +| 3:00-3:30  | VSPAERO Next Steps  Dave Kinney | NASA Ames 
-| 3:30-4:00 Advanced Parameter Linking  Rob McDonald || +| 3:30-4:00 VSPAERO SUGAR braced wing aero  Doug Wells NASA Langley 
-| 4:00-4:30 OpenVSP to OVERFLOW  Joe Derlaga NASA Langley +| 4:00-4:30 Advanced Parameter Linking  Rob McDonald || 
-| 4:30-5:00 Latest in high lift modeling  | Erik Olson | NASA Langley |+| 4:30-5:00 Leveraging DegenGeom for Multi-fidelity Analysis  | Erik Olson | NASA Langley |
 | 5:00-5:30  | Custom Components  | Rob McDonald || | 5:00-5:30  | Custom Components  | Rob McDonald ||
  
workshop2016.1469224892.txt.gz · Last modified: 2018/04/01 14:40 (external edit)